SUCCESS STORY !

Published on October 06, 2023 - Carbovac

Commissioning of the new URV Zephyr 128 Marine in Tenerife!

At Terminales Canarios in Spain, Tenerife island, ALMA CARBOVAC has achieved the whole project for the VRU : from preliminary survey, through facility production till VRU start Why this project was special? Because the VRU is “sea compliant” : stainless steel tank, special painting, compliant with salted corrosion.
this is a great ALMA GROUP Solutions&Services project, showing to our clients how our entities from vapor business are working together, since LUVEBA S.A. will ensure maintenance of the unit

#ALMACARBOVAC #LUVEBA #ALMAGROUP #VAPORRECOVERYUNIT #TENERIFEISLAND #ENVIRONMENT

Published on October 06, 2023 - Carbovac

These articles might interest you

  • Luveba
    https://www.alma-group.com/wp-content/uploads/2024/05/Luveba.jpg
    Luveba, specialist in spare parts for vapor recovery units 03 May 2024 News
    Luveba is (over 15 years) specialized on aftermarket for VRU (Vapor Recovery Unit) from all AD / AB (carbon adsorption + absorption) manufacturersCheck the Safety ; Engineer the equipment, process, instrumentation, controls ; Upgrade existing plant ; Change the vacuum technology ; Service units on s...
    Read more
  • Alma services
    https://www.alma-group.com/wp-content/uploads/2024/08/NOUVELLE-INSTALLATION-LURE.jpg
    Transformation of a DOME loading station into a SOURCE 02 August 2024 News
    We are proud to announce the conversion of a loading station for our customer TotalEnergies at the LURE site.Our operation includes :Removal of existing equipment: gangway and Dôme loading armInstallation of the new SOURCE armsElectrical wiring and commissioning of the three loading armsThis upgrad...
    Read more
  • EIB
    https://www.alma-group.com/wp-content/uploads/2023/12/Port-Louis.png
    New project ! 01 December 2023 News
    EIB Maintenance&Travaux Pétroliers has just started a new project on the station of Port-Louis in Guadeloupe, for one of our top clients. This work consists of neutralizing a tank which had its double coating perforated, rebuilding the vacuum pipework network and installing an electronic gauge...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group