These articles might interest you

  • Deliver up
    https://www.alma-group.com/wp-content/uploads/2024/02/DU-Pellets.jpg
    Installation and formation at Marlim Energies Services ! 08 January 2024 News
    It is getting cold, the opportunity to heat with … wood pellets !Great example with this installation and training at Marlim Energies Services, a PICOTY agency.Navigation, weighing, blown distribution and priting, Deliver Up’s onboard computing monitors every process before, during and a...
    Read more
  • Alma
    https://www.alma-group.com/wp-content/uploads/2023/04/Gravicompt-UNI-2-SIMSA.jpg
    ZOOM ON ALMA IN MEXICO ! 28 April 2023 News
    ALMA and its Mexican partner PETROGAS CORPORATION have just finalized the first two installations in Mexico. A bidirectional metering system Gravicompt UNI-2 has been implement on a 64 000 liters ” double-trailer” tank truck for the transport company LEMARGO (SERVIFACIL Group) and on a 3...
    Read more
  • Luveba
    https://www.alma-group.com/wp-content/uploads/2025/01/Luveba-reno-URV.jpg
    Revamping of a VRU built end 1990’s 08 January 2025 News
    In 2023 Luveba was successful in proposing first step to new client, the basic engineering and design for revamping of a VRU : from LRVP + booster blower (and seal fluid circuit) technology to new vacuum pumps (oil and pallet type, R5 technology). It was then followed by second order, for ordering v...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group