These articles might interest you

  • EIB
    Set-up of a 10 m3 double-walled tank and rehabilitation of the oil piping network (Guadeloupe) 17 January 2023 News
    In a small country station, neutralisation of a 15m3 tank which was pierced and impossible to remove. EIB supplied and placed a new 10 m3 double-walled tank and rehabilitated the oil piping system. This work caused the closure of the station for a month...
    Read more
  • Alma
    https://www.alma-group.com/wp-content/uploads/2024/02/ALMA-Securiterre.jpg
    Zoom on product : The Securiterre 640 18 January 2024 News
    Designed to prevent static accumulation and discharge during multi-sector tanker loading & unloading, this grounding unit Securiterre 640 allows you to control, ensure and maintain the grounding path during all the time of operations. This secure, intuitive and connected product presents multipl...
    Read more
  • Alma
    https://www.alma-group.com/wp-content/uploads/2024/02/ALMA-Soudotec-Senstock.jpg
    Secure your fluid transfer more than ever ! 22 February 2024 News
    As part of the drive to secure and optimise data flows, our ATLAS solution from ALMA CARBOVAC is evolving ! In Senegal, with our partner Soudotec, it has been deployed on different SENSTOCK sites to provide the Senegalese Customs central administration with loading results automatically and in real...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group