First installation of a CMA-Tronique on a container ship for transactional delivery of Biofuel B100!

Published on December 02, 2024 - Alma services

ALMA Services’ Feyzin branch has achieved a first with the installation and regulatory acceptance of a CMA-Troniqu metered distribution system on a Container Carrier for one of our carrier customers, to enable transactional delivery of B100, a biofuel!

Bravo to the mobilized teams and thanks to our customer for his confidence.

Published on December 02, 2024 - Alma services

These articles might interest you

  • Luveba
    https://www.alma-group.com/wp-content/uploads/2024/08/HAZOP.jpg
    HAZOP Study 02 August 2024 News
    You need to Hazop your system – we participate for your process safety management...
    Read more
  • EIB
    https://www.alma-group.com/wp-content/uploads/2025/01/EIB-TE-Capesterre.jpg
    A successful intervention by the EIB teams! 08 January 2025 News
    Our teams replaced a 10m³ tank with a perforated double wall, as well as renewing the suction, discharge and aeration systems for the entire plant, using double-envelope UPP piping for 4 tanks. A big well done to everyone for this technical project, carried out with expertise and precision!...
    Read more
  • EIB
    https://www.alma-group.com/wp-content/uploads/2023/10/VITO-Guadeloupe.gif
    SUCCESS STORY in the French Indies and French Guiana ! 06 October 2023 News
    After having provided preventive and corrective maintenance for VITO gas station (brand of RUBIS ANTILLES GUYANE, RUBIS network) in Guadeloupe, EIB Maintenance&Travaux Pétroliers has just signed a new project ! A new 3-years contract for half of Martinique’s gas stations. At Saint Martin and...
    Read more
Certifications

Recognition of our security and regulatory commitments

Recruitment

Join a growing group